The day after Xu Shucai left.
All four specialty stores had been successfully leased.
The largest was a two-story location with a total area of over 240 square meters.
The smallest was 80 square meters.
The total area of the four specialty stores was over 500 square meters.
As for the specific renovation costs, Wu Jun had Yang Yin discuss all the details with Dong Lizhu.
The two parties settled on a price and signed the contract that same day. Yang Yin's renovation team began work immediately.
Because Wu Jun was pushing for a tight deadline, Yang Yin also brought in some subcontractors to help. Work began on all four stores at once, and the sites were bustling with activity.
Yang Yin was also very dedicated to this collaboration with Wu Jun.
