Because the high-level officials of Xiang Province wanted to win over the newly appointed academician, Chen Xin, the construction of the Ecological Dome proceeded rapidly.
Once the design plans were finalized, and Chen Xin provided 3D printing robots for the construction, the area in front of his shelter quickly became a bustling construction site.
Two drilling rigs, brought in through connections with Xiang Province's high officials, began working simultaneously; one was responsible for the geothermal power plant's Energy Tower pump well, and the other for the Ecological Dome's heating hub return well. At the same time, another team was installing pipelines.
With multiple teams working simultaneously, the area in front of Chen Xin's house was quite lively and noisy, and the stationed special forces became more vigilant about the situation.
