Ves spent the next few days reorienting his focus to supervising the elaborate design process of his Woodsap mechs.
The Terrans invested so much manpower and resources into the elemental Carmine mech designs that it became a challenge to stay on top of every single development.
His collaborators were not just satisfied with publishing a single model.
They split up the project into several different branches, each led by a different team of Master Mech Designers.
This way, the Terrans not only promoted greater diversity, but also increased the fault tolerance of the overall effort.
All of this increased the complexity of the Carmine design project. Too much was at stake here. The Terrans thoroughly considered it to be a prestige project, one that could reinvigorate their national pride should it meet their more ambitious goals.
